|
|
Monolithic Equipment

|
|
Tasks such as cleaning, repairing, painting or covering the outside of a Monolithic Dome often means workers must climb to the dome's top and move along its curved roof. How do you do that safely?
Read More... |
|

|
|
This heavy duty pump has been in development for years at the Monolithic Dome Institute. It was put to its first real test in Italy, Texas to build a 60' dome during a 2005 workshop. |
|
|
The GHP 2000 Monolithic Concrete Pump was the focus of a feature in the January/February 2007 issue of Concrete and Masonry Construction Products, which has a circulation of more than 35,000. The magazine touted several advantages of the pump in its equipment overview.
Read More... |
|
|
The Monolithic Dome makes a super-efficient and functional steel fabrication facility or heavy equipment shop. One reason is because the Dome is ideally suited for a polar crane. What is a polar crane? A polar crane has one end that swivels in the middle and the other end which rotates around the perimeter. Inside a Monolithic Dome, a polar crane never gets trapped. You can always maneuver it to the left or right. |
|
|
This lightweight concrete pump which weighs only 800, is run by a
highly-reliable Honda power pack. It's a sturdy workhorse made better
with the added improvement of a direct drive to the carousel. The Direct Drive can pump up to 3 cubic yards per hour yet weighs less than 800 pounds and is small enough to fit in the bed of a pickup truck. Its 1.5-inch hoses are light enough to be easily handled with lengths of 25 to 50 feet. With a five-gallon fuel capacity, the pump can run eight or more hours without refueling. |
|
|
|
|
Inflating an EcoShell I is a little more complex than inflating
a Monolithic Dome. The EcoShell I should be inflated to 6 to 8 inches
of water column pressure and does not require a large blower if
the Airform is sealed tight. If not sealed tight, it will not work
properly.
|
|
|
|
|
New Improvement for the Monolithic Vibrating Screen
|
|
|
|
|
We believe we have found the answer to the CO2 issue.
It comes in the form of an ERV (Energy Recovery Ventilator-- often
called an HRV, Heat Recovery Ventilator). These machines bring outside
"fresh" air into the home and exhaust an equal amount
of the home's stale air.
|
|
|
|
|
We have tried so many different trailers, we've lost count. Finally,
after a years of research and development, we've settled on a line
of trailers we believe to be the very best value. These are the
most heavy duty trailers for the least amount of money available.
|
|
|
|
|
The Monolithic Portable Concrete Mixer brings the term "portable
concrete mixer" to a whole new level. It is an attachment for
a skid-steer or other front-end loader so it is totally mobile.
It is self-loading, so sand and gravel do not need to be hand shoveled.
It mixes extremely quickly and is easy to maintain.
|
|
|
|
|
Using the Monolithic
Airlock Kit saves measuring and welding time and provides convenience
to the dome builder because the frame is pre-welded and the holes
pre-drilled. The kit does not include lumber, but six sheets of
standard 3/4" plywood is recommended for assembly.
|
|
|
|
|
The new Vibrating Screen created by Monolithic Equipment Manufacturing
is especially designed to fit on the hopper of the EHP 1500 and
EHP 2000 pump. It's sole purpose is to filter out wrong-size aggregate
and trash that often comes in aggregate and/or concrete from Ready
Mix plants. Also, sand or aggregate may not always mix well.
|
|
|
|
|
Blaine's association with Monolithic spans many years. He says,
"David South and I have known each other for a long time. We were
neighbors in Idaho. David lived on the south side of the south butte,
I lived on the west side of the north butte, and we went to church
together."
|
|
|
|
|
When it comes to building a Monolithic Dome -- spraying foam, setting
rebar, spraying concrete, cleaning up -- being able to easily and
safely move in a circle, around the dome's inside perimeter is a
real advantage.
|
|
|